{"id":592,"date":"2020-09-21T09:15:34","date_gmt":"2020-09-21T07:15:34","guid":{"rendered":"https:\/\/academy.tecnostrutture.eu\/en\/?post_type=cbwpt_publications&#038;p=592"},"modified":"2021-04-23T11:10:23","modified_gmt":"2021-04-23T09:10:23","slug":"covid-19-health-emergency-what-changes-in-the-way-you-work-on-site","status":"publish","type":"cbwpt_publications","link":"https:\/\/academy.tecnostrutture.eu\/en\/publications\/covid-19-health-emergency-what-changes-in-the-way-you-work-on-site\/","title":{"rendered":"Covid-19 health emergency: what changes in the way you work on site?"},"content":{"rendered":"<!-- wp:paragraph -->\n<p><strong>From design to the construction site:&nbsp;<\/strong><br \/><strong>The case of the Principality of Monaco<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The Covid-19 health emergency has changed both the way of living in the short term, and that of working in the long term. In order to achieve the primary objective of ensuring health and safety of employees on the construction site, the construction world has realised what are the restrictions and working conditions brought by new rules and procedures related to social distancing.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:crispybacon-knowledgebase-blocks\/block-08 \/-->\n\n<!-- wp:paragraph -->\n<p><strong>From\non-site to off-site construction<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>From the design to the construction phase, the\ngreatest challenge is related to physical distancing on the working site. To\naddress this topic, one solution consists in the transition from a traditional\non-site way of building to off-site construction.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><br \/><\/p>\n<!-- \/wp:paragraph -->\n\n\n<div class=\"registration-needed-container\"><p>To read the full article<\/p><button class=\"more-link theme-button\" data-click=\"showPopup\" href=\"javascript:void(0)\">Insert your email<\/button><\/div>","protected":false},"excerpt":{"rendered":"<p>The Covid-19 health emergency has changed both the way of living in the short term, and that of working in the long term. In order to achieve the primary objective of ensuring health and safety of employees on the construction site, the construction world has realised what are the restrictions and working conditions brought by new rules and procedures related to social distancing.<\/p>\n","protected":false},"featured_media":605,"template":"","meta":{"cbwpt_event_date":"","cbwpt_event_time":"","cbwpt_event_location":"","cbwpt_event_signup":"","cbwpt_event_document":"","cbwpt_slideshow":"[{\"id\":605,\"url\":\"https:\/\/academy.tecnostrutture.eu\/en\/wp-content\/uploads\/sites\/2\/2020\/09\/COVID-19-health-emergency-changes-on-construction-site.jpg\"}]","cbwpt_video":""},"filter":[6,15],"_links":{"self":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications\/592"}],"collection":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications"}],"about":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/types\/cbwpt_publications"}],"version-history":[{"count":7,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications\/592\/revisions"}],"predecessor-version":[{"id":829,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications\/592\/revisions\/829"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/media\/605"}],"wp:attachment":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/media?parent=592"}],"wp:term":[{"taxonomy":"filter","embeddable":true,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/filter?post=592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}