{"id":857,"date":"2021-07-09T09:45:42","date_gmt":"2021-07-09T07:45:42","guid":{"rendered":"https:\/\/academy.tecnostrutture.eu\/en\/?post_type=cbwpt_publications&#038;p=857"},"modified":"2021-07-09T09:52:41","modified_gmt":"2021-07-09T07:52:41","slug":"speed-and-flexibility-of-the-nps-offsite-construction-system","status":"publish","type":"cbwpt_publications","link":"https:\/\/academy.tecnostrutture.eu\/en\/publications\/speed-and-flexibility-of-the-nps-offsite-construction-system\/","title":{"rendered":"Speed and Flexibility of the NPS\u00ae Offsite Construction System"},"content":{"rendered":"<!-- wp:paragraph -->\n<p><strong>The Construction of a 2,200 m2 building in 6 months during Pandemic<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>Foundations in January 2020 and delivery in July 2020. In just 6 months, thanks to the NPS\u00ae offsite construction system, the Tecnostrutture Team worked on a 2,200m2 building in the province of Belluno (Italy). Considering a 4-week interruption due to Covid-19, the construction site continued at a non-stop pace thanks to the flexibility of the structures used.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:crispybacon-knowledgebase-blocks\/block-08 \/-->\n\n<!-- wp:paragraph -->\n<p>PDTI NPS\u00ae columns, which are ideal for constructions in seismic areas as well as for maximum use of space, were used together with NPS\u00ae CLS beams with a composite steel-concrete structure, that are suitable for buildings with large loads and\/or spans. The use of a simplified modular construction system has significantly reduced construction time by facilitating and speeding up the building construction.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Discover the work phases, step by step.<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n\n<div class=\"registration-needed-container\"><p>To read the full article<\/p><button class=\"more-link theme-button\" data-click=\"showPopup\" href=\"javascript:void(0)\">Insert your email<\/button><\/div>","protected":false},"excerpt":{"rendered":"<p>In just 6 months, thanks to the NPS\u00ae offsite construction system, the Tecnostrutture Team worked on a 2,200m2 building in the province of Belluno (Italy). <\/p>\n","protected":false},"featured_media":863,"template":"","meta":{"cbwpt_event_date":"","cbwpt_event_time":"","cbwpt_event_location":"","cbwpt_event_signup":"","cbwpt_event_document":"","cbwpt_slideshow":"[{\"id\":863,\"url\":\"https:\/\/academy.tecnostrutture.eu\/en\/wp-content\/uploads\/sites\/2\/2021\/07\/speed-flexibility-NPS-offsite-construction-system-2.png\"}]","cbwpt_video":""},"filter":[9,6,11],"_links":{"self":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications\/857"}],"collection":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications"}],"about":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/types\/cbwpt_publications"}],"version-history":[{"count":4,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications\/857\/revisions"}],"predecessor-version":[{"id":867,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/cbwpt_publications\/857\/revisions\/867"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/media\/863"}],"wp:attachment":[{"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/media?parent=857"}],"wp:term":[{"taxonomy":"filter","embeddable":true,"href":"https:\/\/academy.tecnostrutture.eu\/en\/wp-json\/wp\/v2\/filter?post=857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}