How to Make a 33-Storey Residential Structure Seismic- Resistant?
The Eurosky Tower is the highest tower in Rome. It is 120 metres high and it has been built quickly and using methods that had never been used before in Italy.
Featured videos and publications
The Eurosky Tower is the highest tower in Rome. It is 120 metres high and it has been built quickly and using methods that had never been used before in Italy.
The Covid-19 health emergency has changed both the way of living in the short term, and that of working in the long term. In order to achieve the primary objective of ensuring health and safety of employees on the construction site, the construction world has realised what are the restrictions and working conditions brought by new rules and procedures related to social distancing.
The interview describes the replacement of a bridge that had become unsuitable and unsafe due to the deterioration and deterioration of its load-bearing structures, with an offsite NPS structure in reinforced concrete, with a single span of 25.6 metres and an 11-metre wide section.
In the last decades, construction has shown a delay compared to other sectors in terms of productivity performance. There is currently an opportunity for a change of pace that allows to implement the future of construction today: this opportunity consists in using offsite production to manage many aspects of the building process, switching specific activities away from traditional onsite operations.