How to build safely in a seismic area?
The meaning of "safe" also extends to limiting overall losses. This view involves a review of design logic.
The meaning of "safe" also extends to limiting overall losses. This view involves a review of design logic.
The construction world through its fields of action can' begin to help the European Green Deal achieve its goals related primarily to the issue of sustainability.
The interview describes the replacement of a bridge that had become unsuitable and unsafe due to the deterioration and deterioration of its load-bearing structures, with an offsite NPS structure in reinforced concrete, with a single span of 25.6 metres and an 11-metre wide section.
How to create a synergy between teams to meet the schedule and complete a construction site quickly, safely and efficiently, while respecting the environmental and historical context.
The reduction of operations performed onsite, as well as a higher predictability and a standardisation of tasks, means a consequential reduction in risk. This article contains an analysis of the 5 main reasons why MMC mean increased safety for workers, especially on the construction site.
DfMA is not about choosing a way of building an asset, like deciding which materials to use. It’s a fundamentally different approach to building and the built environment. Everything that enables manufacture and assembly is different from a traditional approach; and it starts with the design process.
The modernisation of the construction industry has been increasingly compared to what happens in the automotive sector, in which components are manufactured at the factory through a streamlined process, thus ensuring adequate quality and the lowest possible carbon footprint.
In just 6 months, thanks to the NPS® offsite construction system, the Tecnostrutture Team worked on a 2,200m2 building in the province of Belluno (Italy).
In the last decades, construction has shown a delay compared to other sectors in terms of productivity performance. There is currently an opportunity for a change of pace that allows to implement the future of construction today: this opportunity consists in using offsite production to manage many aspects of the building process, switching specific activities away from traditional onsite operations.
The Eurosky Tower is the highest tower in Rome. It is 120 metres high and it has been built quickly and using methods that had never been used before in Italy.